Megawatt-Hour Utility Scale
Reliable Off-Grid Power
Robust solutions for grid-scale battery storage and off-grid power supply. Provide dependable standalone power for islands and remote sites.
Microgrid Integration
Smooth renewable output and maximize ROI from clean energy.
Backup & Resilience
Ensure critical load backup and enhance energy resilience. Aggregate distributed assets for grid services and market participation.
High-Density Storage & Peak Shaving
Optimize energy costs through intelligent demand-side management.
Application Scenarios
Grid & Utility Applications
Related Products
Related Project
FAQ
What certifications do SolarEast’s cabinets comply with?
A.All products meet: Safety: IEC 62619, UL 1973 (battery), UL 9540A (fire). Grid compliance: CE, UKCA, IEEE 1547 for grid interconnection. Transport: UN38.3 for lithium batteries.
Can the ESS serve as a backup power supply?
A.Yes. SolarEast BESS's industrial energy storage systems offer UPS-like functionality, providing backup power instantly during grid outages or voltage drops, protecting sensitive equipment.
What communication protocols are supported?
A.Standard: CAN2.0B, Modbus RTU over RS485. Optional: IEC 61850, DNP3 for utility-scale integration. Cloud EMS: Supports dynamic tariff optimization and peak load shifting.
What are the key product lines in SolarEast BESS’s C&I ESS portfolio?
A.What are the key product lines in SolarEast BESS’s C&I ESS portfolio? 100kWh/125kWh/215kWh/241kWh/261kWh/418kWh AC-coupled cabinets: Integrated with PCS for grid-tied applications (e.g., peak shaving, PV self-consumption). 418kWh DC-coupled systems: Designed for large-scale DC integration (e.g., solar-plus-storage plants). *Note: 100-215kWh uses 280Ah cells; 241kWh/261kWh/418kWh use 314Ah cells for higher energy density.*
Can the BESS system be customized?
A.Yes. SolarEast BESS provides OEM/ODM solutions to meet specific capacity, voltage, and integration requirements for different business needs.
Online Consultation
Contact Us
GET IN TOUCH
FREE Request a Quote!
No.968 Guanlin Road, Luolong District, Luoyang City, Henan Province, P.R. China